Description
Product details
Window/Doors joining walls should be plastered from inside as well as outside. The opening in which the new window shall be installed shall be free from any obstruction. The sill should be well plastered In case of the doors the floorings should be complete Each windows should be adequately and properly shimmed to the plum level.



